1

A two-stage stochastic rule-based model to determine pre-assembly buffer content

pwdbnfopmfpnd
Abstract This study considers instant decision-making needs of the automobile manufactures for resequencing vehicles before final assembly (FA). We propose a rule-based two-stage stochastic model to determine the number of spare vehicles that should be kept in the pre-assembly buffer to restore the altered sequence due to paint defects and upstream department constraints. First stage ... https://macorners.shop/product-category/gift-box-set/
Report this page

Comments

    HTML is allowed

Who Upvoted this Story